[Construction Example] Condenser Dismantling (2nd Floor Inside Building)
Adopting construction methods that minimize vibration, noise, and dust! Safe and efficient removal.
We would like to introduce a case where we removed aging capacitors and unnecessary manufacturing equipment, piping, and frameworks at our company. The layout of the equipment was complex, and the removal route was narrow, making it difficult to use heavy machinery. Therefore, manual dismantling was necessary to ensure that the work could be done safely and efficiently. Through a site survey, we accurately understood the structure, equipment layout, and removal route, allowing us to complete the dismantling safely while maintaining factory operations. 【Case Overview】 ■Challenges - The layout of the equipment was complex, and the removal route was narrow, making it difficult to use heavy machinery. - Manual dismantling was necessary to ensure safe and efficient work. ■Results - Completed dismantling safely while maintaining factory operations. - Secured new space by removing unnecessary equipment. - Received high praise from customers for being able to remove equipment without stopping production. *For more details, please download the PDF or feel free to contact us.
- Company:倉持鉄工
- Price:Other
![[Construction Example] Condenser Dismantling (2nd Floor Inside Building)](https://image.mono.ipros.com/public/product/image/2116713/IPROS5629023514616410356.png?w=280&h=280) 
 